Dec 14, 2025 Leave a message

What Issues Should A Novice Operator Pay Attention To When Operating A Rotary Drilling Rig?

Rotary drilling rigs are mainly used for civil and industrial construction, railway and bridge foundation construction. The hydraulic system adopts a load-sensitive system and pilot control loop to achieve optimal matching under various working conditions and loads. What issues should a novice rotary drilling rig operator pay attention to? Today, Shandong Liqiang, a rotary drilling rig manufacturer, will discuss this in detail with you.#small drill#

What Is The Maintenance Cycle For Rotary Drilling Rigs?

Operating Instructions for Tracked Rotary Drilling Rigs: Piling rig operators should pay attention to the following points during piling to avoid accidents!

1. A red light should be installed on the top of the tracked rotary drilling rig's (hereinafter referred to as the rotary drilling rig) column. This light must be illuminated at night as a height warning sign. The user should install it according to the actual situation.

2. A lightning rod should be properly connected to the top of the tracked rotary drilling rig's column. Work should be stopped immediately in the event of a lightning strike.#small drill#

3. The tracks of the rotary drilling rig should be close to the ground during operation.

4. If the working wind force exceeds level 6, the piling rig should be stopped. Hydraulic cylinders should be used for auxiliary support, and guy ropes should be added for securing it if necessary.

5. During tracked piling operations, avoid collisions between the drill rod, reinforcing cage, etc., and the column.

6. Once the drill rod or pile has entered the ground, it is strictly forbidden to move the piling frame.

7. When drilling with a crawler rotary drilling rig, the ammeter current must not exceed 100A. If the current exceeds 100A, the drill rod should be lowered immediately, but the power head should continue drilling. The drill rod can only be lowered slowly again when the current drops below 100A and stabilizes.

8. When applying pressure to a driven pile, the front of the pile frame should not be lifted.

9. The crawler pile frame moves and moves the pile position. The pile frame uses tracks to move and a slewing mechanism to rotate, allowing for accurate alignment with the pile position. If the pile frame position does not meet the pile position requirements, it can move forward or backward or rotate.#small drill#

 

Send Inquiry

whatsapp

Phone

E-mail

Inquiry